Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Şentürk, H A and Yazici, G (2004) Case Study: Izmit Domestic and Industrial Water Supply Build–Operate–Transfer Project. Journal of Construction Engineering and Management, 130(03), 449–54.

Abudayyeh, O, Dibert-DeYoung, A and Jaselskis, E (2004) Analysis of Trends in Construction Research: 1985–2002. Journal of Construction Engineering and Management, 130(03), 433–9.

Bossink, B A G (2004) Managing Drivers of Innovation in Construction Networks. Journal of Construction Engineering and Management, 130(03), 337–45.

Christini, G, Fetsko, M and Hendrickson, C (2004) Environmental Management Systems and ISO 14001 Certification for Construction Firms. Journal of Construction Engineering and Management, 130(03), 330–6.

Fang, D P, Huang, X Y and Hinze, J (2004) Benchmarking Studies on Construction Safety Management in China. Journal of Construction Engineering and Management, 130(03), 424–32.

Gransberg, D D, Karaca, I and Senadheera, S (2004) Calculating Roller Requirements for Chip Seal Projects. Journal of Construction Engineering and Management, 130(03), 378–84.

  • Type: Journal Article
  • Keywords: Productivity; Construction equipment; Sealing; Constructability; construction industry; equipment evaluation; quality control; productivity; civil engineering;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:3(378)
  • Abstract:
    This paper details a mathematical algorithm to determine the required number of rollers for a chip seal project’s equipment spread based on maximizing the asphalt distributor’s production and adhering to specified roller time requirements. The paper reports one of the findings of a three-year constructability review of the Texas Department of Transportation’s statewide seal coat program. One of the findings of that study was that there was a correlation between the number of rollers used on a job and the loss of aggregate after construction was completed. The roller is the tool used to seat the aggregate and create embedment in the asphaltic binder. Thus, the failure to achieve design embedment depth is primarily a function of achieving quality control requirements for roller linger time. The paper illustrates a straightforward method to calculate the required number rollers to achieve both maximum productivity for the chip seal paving train and to ensure a uniform distribution of roller coverage across the width of the shot. The paper concludes that designing the roller spread is in the best interests of both the chip seal contractor and the owner.

Han, S H, Diekmann, J E, Lee, Y and Ock, J H (2004) Multicriteria Financial Portfolio Risk Management for International Projects. Journal of Construction Engineering and Management, 130(03), 346–56.

Moussourakis, J and Haksever, C (2004) Flexible Model for Time/Cost Tradeoff Problem. Journal of Construction Engineering and Management, 130(03), 307–14.

Nima, M A, Abdul-Kadir, M R, Jaafar, M S and Alghulami, R G (2004) Constructability Concepts in Kuala Selangor Cable-Stayed Bridge in Malaysia. Journal of Construction Engineering and Management, 130(03), 315–21.

O’Connor, J T and Yang, L (2004) Project Performance versus Use of Technologies at Project and Phase Levels. Journal of Construction Engineering and Management, 130(03), 322–9.

Peng, J (2004) Structural Modeling and Design Considerations for Double-Layer Shoring Systems. Journal of Construction Engineering and Management, 130(03), 368–77.

Pietroforte, R and Stefani, T P (2004) ASCE Journal of Construction Engineering and Management: Review of the Years 1983–2000. Journal of Construction Engineering and Management, 130(03), 440–8.

Seo, S, Aramaki, T, Hwang, Y and Hanaki, K (2004) Fuzzy Decision-Making Tool for Environmental Sustainable Buildings. Journal of Construction Engineering and Management, 130(03), 415–23.

Shen, L Y, Li, Q M, Drew, D and Shen, Q P (2004) Awarding Construction Contracts on Multicriteria Basis in China. Journal of Construction Engineering and Management, 130(03), 385–93.

Wang, W (2004) Electronic-Based Procedure for Managing Unbalanced Bids. Journal of Construction Engineering and Management, 130(03), 455–60.

Warszawski, A and Sacks, R (2004) Practical Multifactor Approach to Evaluating Risk of Investment in Engineering Projects. Journal of Construction Engineering and Management, 130(03), 357–67.

Zayed, T M and Halpin, D W (2004) Quantitative Assessment for Piles Productivity Factors. Journal of Construction Engineering and Management, 130(03), 405–14.

Zayed, T M and Halpin, D W (2004) Simulation as a Tool for Pile Productivity Assessment. Journal of Construction Engineering and Management, 130(03), 394–404.